FREYJA OF ORWELL - REFIT JOB LIST 2006-07 at 21/March

DESCRIPTION

RESOURCE

STATUS

COMMENTS

DURING DELIVERY TO WINTER LAY-UP –

Drain holding tank and flush through with several changes of water. Treat with special holding tank cleaner, drain tank and shut both red handled valves.

Yacht Husband

COMPLETED

 

Arrange professional survey if required.

Yacht Husband

NOT REQUIRED

 

Empty food lockers and dispose of perishable items.

Yacht Husband

COMPLETED

 

Add anti-bacterial treatment to fuel tank

Yacht Husband

COMPLETED

 

Empty spare fuel containers into boat’s fuel tank and top up tank with fuel.

Yacht Husband

COMPLETED

 

Insert purifier in the drinking water tank and drain tank

Yacht Husband

COMPLETED

 

Empty emergency drinking water containers.

Yacht Husband

COMPLETED

 

Arrange Lift-out and provision of a storage cradle ashore.

Yacht Husband

COMPLETED

 

Arrange removal of mast if required.

Yacht Husband

NOT REQUIRED

 

Winterise engine as per separate schedule.

 

COMPLETED

 

Remove wet cell batteries to winter storage and trickle charge.

Yacht Husband

NOT REQUIRED

Charged on board from shore power

Unbend the Genoa and pack up to be taken to the sailmaker.

 

COMPLETED

 

Detach Genoa sheets and coil for winter storage.

 

COMPLETED

 

Secure Genoa halyard for winter storage.

 

COMPLETED

 

Take the Genoa off the boat and arrange laundering, repair and storage.

 

COMPLETED

New sail being purchased

Secure main halyard, reefing pendants and lazyjacks for winter storage.

 

COMPLETED

 

Unbend the Mainsail and pack up to be taken to the sailmaker.

 

COMPLETED

 

Take the Mainsail off the boat and arrange laundering, repair and storage.

Yacht Husband

COMPLETED

Taken to Dolphin Sails

Take the Storm Jib off the boat and arrange dry storage.

David Crofts

COMPLETED

Taken by David Crofts

Take the Storm Trysail off the boat and arrange dry storage.

David Crofts

COMPLETED

Taken by David Crofts

Take the Liferaft off the boat and arrange winter storage. (Service not required until 2008/9)

Yacht Husband

COMPLETED

Taken to Suffolk Sailing

Check there are 8 lifejacket/harnesses; take them off the boat and arrange winter storage and annual service.

Yacht Husband

COMPLETED

Taken to Suffolk Sailing

Check 8 harness lines and 8 crotch straps; take them off the boat, examine for wear and replace if necessary.

Yacht Husband

COMPLETED

Taken to Suffolk Sailing

Take the dinghy off the boat and arrange cleaning and servicing.

David Crofts

COMPLETED

Taken by David Crofts

Take off ropes & warps, but leave 6 fenders and 4 warps on board for launching.

David Crofts

COMPLETED

Taken by David Crofts

Take the Ship's Papers and Operating Manual off the boat.

Yacht Husband

COMPLETED

Taken by Yacht Husband

Take the Charts off the boat.

Tom Kittle

COMPLETED

Taken by Tom Kittle

Take the Pilot Books and Tidal Atlases off the boat.

Tom Kittle

COMPLETED

Taken by Tom Kittle

Take the portable VHF radio off the boat

Yacht Husband

COMPLETED

Taken by Yacht Husband

Take the hand-bearing compass off the boat.

Yacht Husband

COMPLETED

Taken by Yacht Husband

Take the cushions off the boat and store for the winter.

 

NOT REQUIRED

Boat heater and dehumidifier fitted

Take the berthing plank off the boat and store for the winter.

Richard Maxwell

COMPLETED

Taken by Richard Maxwell

Remove the Jackstays, examine for wear and order replacements if necessary.

Brian Barnes

COMPLETED

Taken on 7/1/07

Take the cutlery & utensils off the boat.

David Crofts

COMPLETED

Taken by David Crofts

Take the curtains off the boat and arrange laundering or cleaning.

Mary Reed

COMPLETED

Taken on 7/1/07

Deliver the ladder to the boat and secure to the boat cradle

Richard Maxwell

COMPLETED

Done by Richard Maxwell

Fit new batteries and test the hand-held VHF radio.

Yacht Husband

IN PROGRESS

 

Check operation of the mouth-blown foghorn, replace if faulty.

Tom Tooley

COMPLETED

 

Check operation of the aerosol operated foghorn, replace if faulty.

Tom Tooley

COMPLETED

 

Check there is a spare aerosol for the foghorn, replace if necessary.

Tom Tooley

COMPLETED

 

Replace all dry cell batteries in use as per separate schedule.

Yacht Husband

IN PROGRESS

Schedule being re-written by YH

Check the stock of spare dry cell spare batteries as per separate schedule. Purchase new batteries as necessary.

Yacht Husband

IN PROGRESS

Schedule being re-written by YH

Check the stock of spare bulbs as per separate schedule and purchase new bulbs as necessary.

Yacht Husband

NOT STARTED

 

Replace frayed and worn genoa sheets. Investigate cause and eliminate if possible.

Yacht Husband

NOT STARTED

Waiting return ot sail and sheets

Fit Stereo player donated by Paul Davies.

Dave Goodridge

IN PROGRESS

 

Replace Dan-buoy holder after Fox's have fitted the new antenna mast

Tom Tooley

COMPLETED

 

Re-pack the rudder stock greaser with waterproof grease

Tom Tooley

COMPLETED

 

Purchase electronic chart cartridges as specified by Tom Kittle and place them on board

Yacht Husband

IN PROGRESS

One reinstalled, another to be bought

Polish the hull above the waterline, and the cabin trunk

 

IN PROGRESS

 

Arrange professional survey of the gas system including the cooker and obtain 'Corgi' gas certificate for 2007

Yacht Husband

IN PROGRESS

Cooker removed for servicing

Repair faulty ignition system on right-hand gas ring.

Gas Fitter

IN PROGRESS

Cooker removed for servicing

Tboroughly clean the cooker inside and out and the cooker space behind and under the cooker.

Jean Rehill

IN PROGRESS

Over door glass to be re-fitted

Purchase and fit an AIS Engine to drive the Raymarine 'E' series displays.

Fox's

IN PROGRESS

Fitting in progress

Purchase and fit a radar transponder at the masthead

Fox's

IN PROGRESS

Fitting in progress

Check the Ship's Papers and correct as necessary.

Yacht Husband

IN PROGRESS

 

Update the Charts in time for the new season.

Tom Kittle

IN PROGRESS

 

Update the Pilot Books & Tidal Atlases in time for the new season.

Tom Kittle

IN PROGRESS

 

Purchase new Pilot Books and Tidal Atlases as required.

Tom Kittle

IN PROGRESS

 

Wash the cutlery & utensils & return to the boat

 

COMPLETED

 

Wash the curtains.

Mary Reed

COMPLETED

 

Check the expiry date of flares as per separate schedule and replace if necessary.

Yacht Husband

IN PROGRESS

Order for new flares placed

Dry and inspect the Storm Jib and arrange any necessary repairs  

David Crofts

COMPLETED

 

Dry and inspect the Storm Trysail & arrange any necessary repairs

David Crofts

COMPLETED

 

Examine and service all ropes & warps.

David Crofts

COMPLETED

 

Replace the sacrificial anode on the hull.

 

COMPLETED

 

Treat Cockpit Seats with Teak Oil

 

COMPLETED

 

Treat Cockpit Grating and Sugar Scoop Decks with Teak Oil

 

COMPLETED

 

Treat Aft Cabin Top with Teak Oil

 

COMPLETED

 

Treat Main Deck with Teak Oil

 

COMPLETED

 

Provide a step on the mast to enable the halliard shackle to be reached more easily

Yacht Husband

COMPLETED

Ordered from Fox's Riggers

Arrange fitting of new upper propeller shaft seal.

Fox's

COMPLETED

 

Check the main cabin fire extinguisher pressure gauge and expiry date.

Jeff Herschel

COMPLETED

 

Check the fore cabin fire extinguisher pressure gauge and expiry date.

Jeff Herschel

COMPLETED

 

Check the aft cabin fire extinguisher pressure gauge and expiry date.

Jeff Herschel

COMPLETED

 

Check the cockpit locker fire extinguishers (2) pressure gauges and expiry dates

Jeff Herschel

COMPLETED

 

Clean out the bilge, including under engine and in the cockpit lockers.

Jean Rehill

COMPLETED

 

Check contents of the First Aid kits against the list of Code of Practice requirements, replenish if necessary.

Yacht Husband

COMPLETED

 

Check contents of the engine spares kit, replenish if necessary.

Yacht Husband

COMPLETED

 

Investigate causes of flexible coupling failure

Fox's